1. Alting, L. Computer Aided Process Planning: the state-of-the-art survey / L. Alting, H. Zhang // Intern. J. Prod. Res. - 1989. - Vol. 27, no. 4. - P. 553-585.
2. Halevi, G. Process and Operation Panning / G. Halevi. - Springer, 2003. - 335 p.
3. Bukchin, J. Design of flexible assembly line to minimize equipment cost / J. Bukchin, M. Tzur // IIE Transactions. - 2000. - Vol. 32. - P. 585-598.
4. Gupta, A.K. Optimization of due-date objectives in scheduling semiconductor batch manu-facturing / A.K. Gupta, A.I. Sivakumar // Intern. J. of Machine Tools and Manufacture. - 2006. - Vol. 46. - P. 1671-1679.
5. Burkov, V.N. Models and methods of multiprojects’ management / V.N. Burkov, D.A. Novikov // Systems Science. - 1999. - Vol. 256, no. 2. - P. 5-14.
6. Dolgui, A. Graph approach for optimal design of transfer machine with rotary table / A. Dol-gui, N. Guschinsky, G. Levin // Intern. J. of Prod. Res. - 2009. - Vol. 47, no. 2. - P. 321-341.
7. Dolgui, A. Enhanced mixed integer programming model for a transfer line design problem / A. Dolgui, N. Guschinsky, G. Levin // Computers and Industrial Engineering. - 2012. - Vol. 62, no. 2. - P. 570-578.
8. Levin, G.M. Optimizatsiya rezhimov parallel'noi mnogoinstrumental'noi obrabotki detalei na agregatnom oborudovanii s uchetom gruppovoi smeny instrumentov / G.M. Levin, B.M. Rozin // Informatika. - 2011.- № 3. - S. 33-47.
9. Levin, G.M. Optimizatsiya posledovatel'no-parallel'nogo vypolneniya kompleksa vzaimosvyazannykh operatsii / G.M. Levin, B.M. Rozin // Vestsi NAN Belarusi. Ser. fiz.-mat. navuk. - 2013. - № 1. - S. 111-116.
10. Levin, G. Optimization of Multi-tool Cutting Modes for Batch Manufacturing in Large Se-ries Machining Environment / G. Levin, B. Rozin, A. Dolgui // Proc. of the 14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM’12). - Bucharest, Romania, 2012. - P. 444-448.
11. Rozin, B. Optimization of Multi-tool Cutting Modes in Multi-item Batch Manufacturing System / B. Rozin, G. Levin, A. Dolgui // Proc. of the IFAC Conf. on Manufacturing Modelling, Man-agement and Control (MIM'2013). - SPb., 2013. - P. 766-771.
12. Dolgii, A.B. Optimizatsiya intensivnostei posledovatel'no-parallel'nogo vypolne-niya peresekayushchikhsya mnozhestv operatsii / A.B. Dolgii, G.M. Levin, B.M. Rozin // Mezhdunar. kongress po informatike: informatsionnye sistemy i tekhnologii (CSIST'2013). - Minsk, 2013. - S. 520-524.
13. Rezhimy rezaniya metallov : spravochnik / Yu.V. Baranovskii [i dr.]. - 3-e izd., pere-rab. i dop. - M. : Mashinostroenie, 1972. - 408 s.